Mills Facade Renewal Project

Expect some noise disruption during the exterior facade installation. 

  • Stage one: south side window replacement took place in spring and summer 2026. 
  • Stage two: new facade installation begins in September and will continue through the fall. 
  • Check out our FAQ page to read more about the construction work.  
     
  • Stop by the Mills front desk for complimentary earplugs or for help finding a quieter place to study.  You can also reach us at library@mcmaster.ca 

    Coming soon - the new look of Mills Library! 
    An artist's illustration of the exterior of the southeast side of Mills Memorial Library featuring large windows and a green facade.
    An architectural rendering of the south side of Mills Memorial Library.
Alternative Options

Alternative Mills accessible entrance is found across from the McMaster University Student Centre. 

Disruption Start Time